m

Studio Tecnico Marittimo

Description

On July 2012 STM was appointed to support the Carnival PROJECT team in revitalization project and follow up of life extension works of Carrnival Destiny carried out in Arsenale Triestino Fincantieri shipyard.
Vessel was scheduled to undergo to a refitting stop in Trieste shipyard in February 2013.
Some # 200 new passengers cabins shall be added together with new bars and restaurants, pools and water plays aft etc. on decks from # 3 to# 14.
The scope of work of STM was to design the connections between existing and new systems.

Systems such:
Grey and Black water
Technical water
Hot and Cold poatble Water
New water park
after a on board survey was designed, cheked and integrate on existing drawings.

Services

Basic design
  • PFD Pipe flow diagrams and P&Ids – systems schematic diagrams
  • Project definition, conceptual and operational design, feasibility – costs - performances assessment, applicable Rules and Regulations