m

Studio Tecnico Marittimo

Description

Late in South African winter, STM engineers conducted the lightship check of a triangular semisubmersible column stabilized drilling platform.
More than five hundreds people were working on board for the rig special survey, STM succeed to carry out the weight survey thanks to the Yard and subsuppliers assistance.

Lightship change had been assessed within the limits and inclining test was not necessary.

Services

Consultancy
  • Naval architecture calculation, motion analysis and study of lay